000-000-0000 support@wordpress.com

RapidFix ceilings & Partitions

  • Home
  • About
    • Case studies
  • Services
  • Documents
  • Team
  • Careers
  • Contact
RapidFix ceilings & Partitions-Banner

About

Recommendations

Caddick Construction

Rapidfix were responsible for the delivery of the dry lining, ceilings and firestopping packages.

In that time their management team have proved to be proactive and collaborative with our team and the other contractors on site. They have provided valuable input into the development of the construction programme and are not afraid to be commit to targets, or seek betterment wherever possible.

The work on site has been carried out safely and delivered a high quality product. I would not hesitate to work with Rapidfix again on our future projects and can be contacted as below to discuss in more detail if required.

TOM MAGUIRE > Project Manager

Renaker

Throughout the project RapidFix were professional, collaborative and well organised. The quality of finish was of a very high standard and the works were completed on programme and within the contract value.

JOHN MESSER > Project Manager

Caddick Construction

Throughout the project Rapidfix have been very professional, proactive in solving problems, approachable and well organized. The quality of finish is to a very high standard and the works are being completed within the programme durations.

Their health and safety standards are excellent with regular visits from senior management to ensure that these standards are maintained. They are very innovative with trialing new safety equipment.

I would highly recommend using Rapidfix on future internal fit out projects.

JOE HAMMERTON > Project Manager

Eric Wright Construction

Working with rapid fix has been like a breath of fresh air, they have planned, programmed and implemented the full dry lining package for me at Eric Wright Construction on Vesta Street.

From the quality of install, to the adherence to programme, to the coordination with the M&E contractor and their continual can do attitude to all aspects of construction , I can honestly say that Rapidfix are the best partitioning contractor I have worked with in my 17 years of working in the construction industry.

MYLES ROGERSON > Senior Project Manager

RapidFix Office

Registered Office: 8 Castlegate, Tickhill, Doncaster, DN11 9QU

Head Office: Orega, 76 King Street, Manchester, M2 4NH

enquiries@rapidfixltd.net
T: 07393 196762

DOWNLOADS

Health and Safety
New Starter Form (Sole Trader)
New Starter Form (LTD)
Pre Qualification Questionnaire

MORE INFO

The Team
Careers
Case studies
Contact

  • Pages
    • About
      • Case studies
        • Project: 360
        • Project: Atelier E7 & E8
        • Project: Bolton College of Medicinal Science
        • Project: Crown Street School
        • Project: Greenhaus
        • Project: Lampwick Quay
        • Project: Latitude Purple
        • Project: Luneside
        • Project: New Little Mill
        • Project: One Vesta Street
        • Project: Phoenix
        • Project: Spindles – Phase 3
        • Project: The Blade
    • About
    • Careers
    • Contact
    • Documents
    • Privacy Policy
    • RapidFix Services
    • Services
    • Team
  • Archives

    Meta

    • Log in
    © 2025 Ascent. All rights reserved | Ascent by ZetaMatic